Hi
I have a run of sequentially assigned spin systems that are assigned to the wrong residues (assigned using the "Assign" button below the "Sequence Location" section of the window), however, this region now no longer appears in the "Sequence Location" section and as such the "Deassign" button is not active.
Would it be possible to have a "Deassign" button that would deassign a run of sequentially linked spin systems that was not dependent on the stretch appearing in the "Sequence Location" window. It could be similar to the "clear i-1 links" button but instead deassigns that row and all linked systems.
Otherwise I cannot see how to reassign this region (without doing it manually) as it does not appear in the Sequence Location region (in fact I wonder if this is a bug, sometimes a run of sequentially linked spin systems never appears in the "Sequence Locations", not even with a really low score.)
Cheers
Ben
|