Hi,
Can't we use something like:
Analysis CPU (measured by ATLAS) * Total CPU (measured by APEL) / Total CPU (Measured by ATLAS)
Production CPU (measured by ATLAS) * Total CPU (measured by APEL) / Total CPU (Measured by ATLAS)
Cheers
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
+ Steve Lloyd Queen Mary, University of London +
+ E-mail: [log in to unmask] School of Physics +
+ Phone: +44-(0)20-7882-5057 Mile End Road +
+ Fax: +44-(0)20-8981-9465 London E1 4NS, UK +
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
|