But surely all analysis jobs are not equal? Production simulation could be judged on number of events generated but analysis will vary greatly depending on the physics dataset and the size of the sample. Surely there needs to be some weighting?
John
-----Original Message-----
From: Testbed Support for GridPP member institutes [mailto:[log in to unmask]] On Behalf Of Alessandra Forti
Sent: 04 April 2011 16:53
To: [log in to unmask]
Subject: Re: HEPSPEC06 numbers for GridPP metrics
> HEPSPEC was defined as the power per job if the system is full on the
assumption that it's the maximum throughput that matters.
Then Ewan and Chris point that the we should count the number of jobs
going through and not the HS06 is fair.
cheers
alessandra
|