Hi
I am trying to create a new project using just spectra and the results of a
Cyana run. I have got it to work but there seems to be a problem with the
imported shift list and spectra that are supposed to be linked to that
shiftlist.
If I create a new project, make a molecular system then read in a hsqc
spectra then I then want to import the final.prot shift list from the cyana
structure calculation. I import it and select the "NMR Experiments to link
to" and it seems to work fine. However, if I then go to that spectra and try
and assign a peak (or generate a synthetic list) then it cannot see the
shiftlist even tho in "Edit Experiments" it is in that shiftlist.
If I restart immediately after the import then the spectra does get linked
properly and the generate synthetic peak lists and assigning peaks all works
fine.
Whats worse (and stranger) is that, as far as I can tell, if I dont restart
at that point but instead go on to import other data or open other spectra
(basically do other Analysis/FC things) then I do not seem to be able to
then link that spectra to the shift list. A restart no longer does the
trick. I dont seem to be able to fix the issue in these projects any other
way either. My first few attempts had this problem.
Perhaps I am missing something but it seems to be a problem
Cheers
Ben
|