------------------------------------------------------------------------------------
Publication from : Antun Balaz <[log in to unmask]> (AEGIS01-PHY-SCL)
This mail has been sent using the broadcasting tool available at http://cic.in2p3.fr
------------------------------------------------------------------------------------
AEGIS01-PHY-SCL is in unscheduled downtime as of now, initialy estimated to last until 2006-09-08 17:00 GMT. This is due to the failure of the switch used for WN intercommunication and uplink this morning, in conjunction with the unscheduled site-wide power failure that caused it. All running jobs were lost. Sorry for any inconveniences this may caused.
Currently another (lower quality) switch is used as a replacement, and all queues are disabled. Grid services provided are unaffected, since they are connected through another switch.
Antun Balaz
AEGIS01-PHY-SCL Site Manager
|