dear collegues
we design a dynamic compaction (heavy tamping) of a
10 m' rock fill, mainly composed of soft rocks excaveted materials.
we are looking for approval methods to define the
difference in density between the intial and final stage of
compaction.
SPT, CPT, etc. are not valid methods since the fill
contain stones and hard materials which false the results and damage the test
equipments.
Is anybody have a good advise.
thanks in advance
ron