Hi everyone!
Some good news…We got a response from Innovative!
“Good news eventually. We found the information and will be able run a user copy from Test to Production.
Ports should be open between the two systems.
This process is expected to migrate all of the users from the source system to the target system.
You are aware that this procedure is not all inclusive, in that you should not be expecting a full and complete representation of all workflows, permissions, and applications. It does do most of the work for
you, providing a great head start on the setup of your users, saving time and energy. However, you will still need to police each login, making sure that the user has what they need for Sierra. We suggest the library's Admin perform a side-by-side review of
each user in each of the systems' Admin App's, to verify that things are matching, as Innovative does not expect this process to result in completely matching sets of users in all respects.”
Specifically, 63000/63100 needs to be open between the server with Sierra preview running and the Test DB server.
Hopefully, if anyone else has to go through this, they can point to us and say it’s possible….although it’s not been done yet, and there’s only 7 working days till we go live..eek!
Thanks everyone!
Andrew
From: Andrew Wilson
Sent: 02 October 2018 13:58
To: [log in to unmask]
Subject: RE: Sierra user accounts -- copying from test to live
Thanks Eoin/Jacob/Holly!
@Emma – yep you are correct ! Copy from our separate test instance to live/preview. We think it was either Ryder Gaddis or Adam Viel that told us a few times this was possible, although all in conference calls
so nothing written to prove it!
Glad it’s only 100-120 that the Library need to re-create, rather than 500! It’s a bit frustrating as we have lost 5+ days of Sierra Preview time whilst we wait for Innovative to double-check whether it was
feasible or not (still no definitive answer). We’ll probably lose another couple whilst the accounts get created.
I think it’s probably best I break the bad news to the Library otherwise we may waste more time waiting for an answer that may inevitably be ‘no’.
Thanks again everyone!!
Andrew
From: This list is for current and potential users of the Innopac system [mailto:[log in to unmask]]
On Behalf Of Hollinshead, Emma
Sent: 02 October 2018 12:34
To: [log in to unmask]
Subject: {Disarmed} Re: Sierra user accounts -- copying from test to live
Hi Andrew,
When you say test Sierra system do you mean a completely separate training server to your live server? If so I don’t think there is a way for Innovative to easily copy from a test
server to a live server (so we were told in the past anyway).
However, if you mean they are saying they can’t copy from Sierra preview to Sierra live I’m confused as I’m fairly sure that they did it for our conversion (although I may be mis remembering
as it was a few years ago that we migrated. From memory they copied over all our old logins from Millennium to Sierra. We then had to tidy these up as they were using the initials for permissions rather than the workflows setup. Once these were all tidied
up and permissions assigned in Sierra Preview these were then carried over into Sierra Live.
(Apologies if I have completely misunderstood what you meant in your original message
J)
Cheers
Emma
Emma Hollinshead BA (HONS), PGDip ILM, MA
Systems Specialist
Library Services
Aston University
Aston Triangle
Birmingham
B4 7ET
Direct dial: 0121 204 4503
Internal dial: 4503
Library web page:
http://www.aston.ac.uk/library
ü
Please consider the environment before printing this email
From: This list is for current and potential users of the Innopac system [mailto:[log in to unmask]]
On Behalf Of Andrew Wilson
Sent: 02 October 2018 11:51
To: [log in to unmask]
Subject: Sierra user accounts -- copying from test to live
Hi everyone,
We are almost migrated from Millennium to Sierra (yay!).
Very early on in the process, Innovative told us during multiple conference calls that if we created new user accounts on our test sierra system, they could migrate them over to the production system, with only a few minor configuration
changes needed for each account after that. The Library needed to completely re-work their logons anyway, so this was a good opportunity.
We now have Sierra Preview, and Innovative are now saying that they don’t think there is a way to copy the accounts from Test to Live. The Library face having to re-create all the work they did creating 100+ accounts/generic roles etc.
I was just wondering if anyone did this during their migration so we could point our assigned III project team in that direction?
Thanks,
Andrew
Andrew Wilson
Application Services Manager (Library & Museum)
IT Services
University of St Andrews
Butts Wynd
St Andrews
Tel: +44 (0)1334 462796
The University of St Andrews is a charity registered in Scotland: No SC013532
To unsubscribe from the LIS-EUR-IUG list, click the following link:
MailScanner has detected definite fraud in the website at "emea01.safelinks.protection.outlook.com". Do not trust this website: MailScanner
has detected definite fraud in the website at "emea01.safelinks.protection.outlook.com". Do
not trust this website: https://www.jiscmail.ac.uk/cgi-bin/webadmin?SUBED1=LIS-EUR-IUG&A=1
To unsubscribe from the LIS-EUR-IUG list, click the following link:
https://www.jiscmail.ac.uk/cgi-bin/webadmin?SUBED1=LIS-EUR-IUG&A=1
To unsubscribe from the LIS-EUR-IUG list, click the following link:
https://www.jiscmail.ac.uk/cgi-bin/webadmin?SUBED1=LIS-EUR-IUG&A=1