Hi All, My memory, and huge archive of e-mails, are failing me again. At what point should a downtime in the GOC DB start? If a power interruption is scheduled for Saturday morning, and the longest queue has a walltime limit of 60 hours, we would normally close the queue on Wednesday evening. However, do we need to advertise the downtime from this point, or from when the last ops job is allowed to start, or from the time the machines are actually powered down? Cheers, Ben -- Dr Ben Waugh Tel. +44 (0)20 7679 7223 Dept of Physics and Astronomy Internal: 37223 University College London London WC1E 6BT