Cheers, Pete - much appreciated. Do we have any takers for testing job submission via the ScotGrid WMS for cedar minos.vo.gridpp.ac.uk vo.londongrid.ac.uk vo.northgrid.ac.uk Cheers, Mike. 2009/6/4 Peter Gronbech <[log in to unmask]>: > > Hi Mike, > I have sent a test job using my southgrid voms membership and that worked fine. > Thanks Pete > > -- > ---------------------------------------------------------------------- > Peter Gronbech Senior Systems Manager and Tel No. : 01865 273389 > SouthGrid Technical Co-ordinator Fax No. : 01865 273418 > Department of Particle Physics, > University of Oxford, > Keble Road, Oxford OX1 3RH, UK E-mail : [log in to unmask] > ---------------------------------------------------------------------- > > -----Original Message----- > From: Testbed Support for GridPP member institutes [mailto:[log in to unmask]] On Behalf Of Mike Kenyon > Sent: 29 May 2009 12:19 > To: [log in to unmask] > Subject: Re: RAL Tier1. Details of outage during move to new computer building. > > Hi All, > > The following additional VOs have been enabled on Glasgow's WMS#1: > > cedar > minos.vo.gridpp.ac.uk > vo.londongrid.ac.uk > vo.northgrid.ac.uk > vo.southgrid.ac.uk > > Could someone from each VO please test job submission. Something along > the lines of > > glite-wms-job-submit -a -e > https://svr022.gla.scotgrid.ac.uk:7443/glite_wms_wmproxy_server > <myjob.jdl> > > should do the trick. Sites who support these VOs will presumably have > to reconfigure their UIs to point at this new endpoint once the RAL > WMS starts draining...appropriate changes should be made to > /opt/glite/etc/<VO>/glite_wms.conf and glite_wmsui.conf on the UI. > > Cheers, > Mike. > > > 2009/5/26 Dr Barry MacEvoy <[log in to unmask]>: >> >> We support the following VOs, most of which are never used: >> >> VOS="atlas alice lhcb cms dteam zeus na48 calice ilc biomed babar dzero t2k >> pheno ltwo hone ops gin vo.sixt.cern.ch geant4 camont >> supernemo.vo.eu-egee.org sedi.brunel.ac.uk" >> >> If you'd like me to add some more, I'm happy to do so... but please don't >> make me hunt for the contents of vo.d etc. as that is likely to result >> in a humour shortage. >> >> Cheers, >> >> Barry. >> >> >> >> >> >> >> >> >> >> >> >> >> On Tue, 26 May 2009, Derek Ross wrote: >> >>> Date: Tue, 26 May 2009 16:11:02 +0100 >>> From: Derek Ross <[log in to unmask]> >>> Reply-To: Testbed Support for GridPP member institutes >>> <[log in to unmask]> >>> To: [log in to unmask] >>> Subject: Re: RAL Tier1. Details of outage during move to new computer >>> building. >>> >>> For info, the full list of vos supported by lcgwms03.gridpp.rl.ac.uk along >>> with how many other WMSes support that vo is: >>> >>> cedar 0 >>> manmace 0 >>> minos.vo.gridpp.ac.uk 0 >>> ngs.ac.uk 0 >>> totalep 0 >>> vo.londongrid.ac.uk 0 >>> vo.northgrid.ac.uk 0 >>> vo.southgrid.ac.uk 0 >>> camont 1 >>> t2k 1 >>> gridpp 2 >>> mice 2 >>> vo.nanocmos.ac.uk 2 >>> vo.scotgrid.ac.uk 2 >>> na48 3 >>> pheno 3 >>> supernemo.vo.eu-egee.org 6 >>> fusion 7 >>> babar 9 >>> magic 10 >>> cdf 12 >>> dzero 12 >>> geant4 14 >>> ilc 15 >>> hone 17 >>> esr 20 >>> zeus 20 >>> biomed 42 >>> dteam 108 >>> ops 117 >>> >>> generated using >>> >>> (for i in `ldapsearch -x -H ldap://lcgwms03.gridpp.rl.ac.uk:2170 -bo=grid >>> | grep -i AccessControlRule | sed -e "s/.* //"`; do echo "$i `lcg-infosites >>> --vo $i wms | grep -v gridpp\.rl\.ac\.uk | wc -l`"; done ) | sort -g -k2 >>> >>> Derek >>> >>> >>> >>> On 26 May 2009, at 15:49, Coles, J (Jeremy) wrote: >>> >>>> Hi Dug >>>> >>>> The RAL WMS is in some cases the only one to support some of our local >>>> smaller VOs. All need to be covered during the transition. From Derek's >>>> email earlier we have this list: >>>> >>>> cedar >>>> manmace >>>> minos.vo.gridpp.ac.uk >>>> ngs.ac.uk >>>> totalep >>>> vo.londongrid.ac.uk >>>> vo.northgrid.ac.uk >>>> vo.southgrid.ac.uk >>>> >>>> I have no updates on totalep and manmace no longer functions but the >>>> others would preferably all be hosted on both the Glasgow and IC WMSes. >>>> >>>> The others to be supported are gridpp, camont, and ukqcd VOs: See >>>> https://voms.gridpp.ac.uk:8443/vomses/. I'm assuming the remainder (such as >>>> supernemo, ltwo etc. are covered withinLondon but perhaps someone at IC >>>> could confirm). >>>> >>>> Thanks, >>>> Jeremy >>>> >>>> >>>> From: Testbed Support for GridPP member institutes >>>> [mailto:[log in to unmask]] On Behalf Of Douglas McNab >>>> Sent: 26 May 2009 12:19 >>>> To: [log in to unmask] >>>> Subject: Re: RAL Tier1. Details of outage during move to new computer >>>> building. >>>> >>>> Hi, >>>> >>>> What is the plan/requirment on sites to provide alternative resources? >>>> Glasgow's WMS do not support all VO's is there a requirement to allow more >>>> VO's, if so which ones? Glasgow also has a top level BDII. Other sites can >>>> reconfigure to use it but as RAL has a load balanced system and we do not I >>>> would suggest that we spread the load across other tier2 sites in order to >>>> avoid crashing ours. >>>> >>>> Regards, >>>> >>>> Dug >>>> 2009/5/26 Derek Ross <[log in to unmask]> >>>> Hi, >>>> >>>> Details of the Tier 1's extended downtime for the machine room move in >>>> June/July, the main points that will potentially affect other sites are the >>>> draining of the WMS from the 17-26th, and the downtime for Myproxy and >>>> top-level BDIIs on the 25th, and the LFC & FTS downtimes on the 25-26th. >>>> >>>> Sites may wish to consider reconfiguring their UIs and WNs to avoid >>>> problems. >>>> >>>> Derek >>>> >>>> >>>> >>>> >>>> >>>> Begin forwarded message: >>>> From: "Smith, GR (Gareth)" <[log in to unmask]> >>>> Date: 19 May 2009 12:17:43 BST >>>> To: <[log in to unmask]>, <[log in to unmask]> >>>> Subject: RAL Tier1. Details of outage during move to new computer >>>> building. >>>> >>>> Hi, >>>> >>>> The RAL Tier1 will be moving to a new computer building at the end of >>>> June and beginning of July. The move will entail a significant outage of >>>> the services: Castor will be unavailable for twelve days and the batch >>>> system for around two weeks. >>>> >>>> For the details of the outages please see the entry in the Tier1 blog >>>> at: >>>> >>>> http://www.gridpp.rl.ac.uk/blog/2009/05/14/schedulemovenewbuilding/ >>>> >>>> To ensure as many people as possible are aware of this I have sent this >>>> mail to both the gridpp-ub and gridpp-users lists. My apologies if you >>>> receive it twice. >>>> >>>> Gareth Smith >>>> RAL Tier1 Production Manager. >>>> >>>> -- >>>> Scanned by iCritical. >>>> >>>> >>>> >>>> -- >>>> ScotGrid, Room 481, Kelvin Building, University of Glasgow >>>> tel: +44(0)141 330 6439 >>>> >>>> >>>> >>>> Scanned by iCritical. >>>> >>>> >>> >> >> -------------------------------------------------------------- >> Dr Barry MacEvoy >> High Energy Physics Group >> Imperial College London >> Blackett Laboratory >> Prince Consort Road >> LONDON SW7 2BW >> England >> >> T: +44 20 7594 7802 >> F: +44 20 7823 8830 >> M: 07767 323871 >> >> http://www.hep.ph.ic.ac.uk/cms/people/based_at_imperial.html >> http://www.hep.ph.ic.ac.uk/e-science/people/macevoy.html >> -------------------------------------------------------------- >