---------------------------------------------------------------------------------------------------------------
EGI BROADCAST TOOL : https://operations-portal.egi.eu/broadcast
---------------------------------------------------------------------------------------------------------------
Publication from : Vladimir G. Dimitrov <[log in to unmask]>
Targets : Generic mailing-list/LCG Rollout Mailing List
<[log in to unmask]>
----------------------------------------------------------------------------------------------------------------
Dear all ,
The (lcg-CE) ce.ngcc.acad.bg which is included in BG03-NGCC site will be
decommissioned at 12.11.2012.
The queues have been set in draining mode and a downtime will be defined,
when the running jobs will finish their execution. Finally , the CE will be
deleted from GOCdb.
Vladimir Dimitrov
(NGI_BG RC manager)
----------------------------------------------------------------------------------------------------------------
link to this broadcast :
https://operations-portal.egi.eu/broadcast/archive/id/787
----------------------------------------------------------------------------------------------------------------
|