Hi,
The planned site outage on the RAL Tier1 this morning, Tuesday 9th August, is complete. The work on the site firewall was completed and services are available. The duration of the outage was short (less than ten minutes).
Internally all services at the Tier1 continued running through the network break with the exception of the FTS which was drained ahead of the announced break. The FTS was restarted at about 09:00 local time (08:00 UTC).
Gareth Smith
RAL Tier1 Production Manager
|