Thanks for your help, Massimo.
Massimo Sgaravatto - INFN Padova wrote:
> - If proxy renewal is disabled for a given job , the proxy used for
> submission is delegated on the CE
Yes. If I set myproxyserver="" in the JDL, then each job in turn gets
its newly generated proxy.
> - If proxy renewal is instead enabled for a given job, the WMS tries to
> limit the number of delegations and the longest proxy (used in the
> submissions or got from the myproxy server) is used and renewed whenever
> needed.
Proxy renewal is now enabled. If I submit at (say) 11:30, then destroy
and recreate proxy and resubmit at 11:35, the longer proxy (the one made
at 11:35) never makes it to the worker node. Instead, the older one is
given preference. That is my observation. I wonder how long will the
older proxy be preferred over new ones, as that could be related to the
issue I was thinking about.
Steve
--
Steve Jones [log in to unmask]
System Administrator office: 220
High Energy Physics Division tel (int): 42334
Oliver Lodge Laboratory tel (ext): +44 (0)151 794 2334
University of Liverpool http://www.liv.ac.uk/physics/hep/
|