Hi,
I wrote a blog entry about moving apel to glite-APEL on SL5.
http://northgrid-tech.blogspot.com/2010/07/moving-apel-to-sl5.html
cheers
alessandra
--
The most effective way to do it, is to do it. (Amelia Earhart)
Northgrid Tier2 Technical Coordinator
http://www.hep.manchester.ac.uk/computing/tier2
|