Hi,
I am using CcpNmr 2.1.3. version and I have a problem to transfer a peak
list with dataShifter.
I want to move a peak list from an old to a new project. The new project has
a several spectra so I am not able to associate the peak list to my spectrum
because the spectra list is bigger than monitor and I can not scroll (move
long) the spectra list.
Thanks in advance
cheers,
Valeria
|