Dear DCM experts
In the previous version of DCM (in spm2) it has been shown to be
insensitive to slight changes in timing and it was indicated that DCM does
not require slice timing correction. However, in SPM5, slice-timing
correction is an inherent stage of the DCM specification.
My question is:
1) Why is slice-timing correction needed for DCM in SPM5 (when it was not
necessary in SPM2)?
2) What should we do during DCM specification if our data is already slice-
time-corrected during pre-processing?
Thanks a lot
Tali Bitan
Haifa University
|