Hi All,
I know we have discussed it several times but can someone tell me if the
CLR7 is applied only for the first top metre of soil (in which case I am
assuming that samples taken from 0.8-1.0 m should be included as well)?
Also do we include samples taken from the same trial pit but from
different depths?
Cheers
Themis
|