Hi
I am trying to transfer assignments from one chain onto another chain, the
target chain is identical to the source chain except it has more residues at
the Cterminus.
The Residue Mapping window gets the lining up correct except the last
residue, which it tries to align to the last residue of the target sequence
rather then next residue in the sequence. The "Destination residue" has a
pulldown to allow selection of correct residue but this does not seem to work.
I have attached a screenshot, Residue 85GLN should transfer to 85GLN but
instead it seems to be locked to 202GLN instead (the pulldown lets you
select 85GLN but as soon as you click away from it it rests to 202GLN).
Is there anyway to change the Destination residue or do I need to let the
Copy Chain Assignment copy it to 202 then manually move it to 85?
Cheers
Ben
|