Good day!
Just found that SFT test timings at our site (RRC-KI) are a bit strange:
the typical duration of a test is about 1 hour, but all timestamps for the
individual tests (apart from the 'Test Job Submission' one) are lying
at the first 10 minutes of the whole SFT time. The explanation I came to
that the rest of a time is spent in submission of a results to the R-GMA
and/or at the experimental part of a SFT.
The question is: am I right?
The real problem: I've tried to make a standing reservation on
Torque/MAUI for dteam VO and it will be great if I will be able to estimate
the maximal possible time for the SFT job. Now it is about 1 hour for our
site, but seems that most of the time is spent for something not very
relevant to the stable SFT part. But maybe I am wrong.
Thanks!
--
rea
|