Dear SPM community, we used the FDR method on one of our data sets, setting
the FDR parameter to 0.0001. A colleague of mine is suggesting that we
report the thresholding this way:
p < 0.0001, FDR corrected
Would it be better to say instead
FDR < 0.0001
? Or maybe
q < 0.0001
?
Thanks,
joe
|